Crew

Survey, workshop and install are one crew

At Kamelya, size, cutting and handover are not split across subcontractors. The crew that writes the survey note follows the ticket in the shop and is on site on anchor day.

  • Survey Size, ground, wind note
  • Workshop Cut and dry-fit
  • Site Anchors and handover list

Roles

How the crew is split

Survey, cutting and install sit on one chain; the size note feeds the shop, handover stays with the same crew.

Survey

Size and ground

Laser size, rain direction and boundary go into the survey note. No lead without KVKK consent; the firm price locks after that note.

Workshop

Cut and check

Timber moisture, profile thickness and slat gap sit on the ticket. Roof, gutter and rail are prepared at a separate station; dry-fit is before dispatch.

Site

Install and handover

Anchors, roof and rails are the same crew. Torque, leaks and gaps are ticked on the list; the job is not closed without a signature.

People

Published crew

Production and site leads are listed below.

The crew is not published yet. You can meet production and site staff during a survey visit.

Company

Workshop and files