Ground and Anchors: Why the Survey Locks Price

Slope, concrete piers, deck and a 50 cm boundary are logged on site. Crane and levelling are extra lines; m² alone is not a quote.

Ground and Anchors: Why the Survey Locks Price

A firm price does not lock without laser measure plus a ground note. Sloped gardens need adjustable feet or concrete piers as their own line. A frame on deck needs different torque than soil anchors. Boundary under 50 cm: side panel and wind direction are drawn together. A gate under 2.5 m means split delivery and about half a day extra.

Which ground needs which foot?

GroundFixQuote line
Level concreteChemical anchor / plateAnchors
Slope / fillAdjustable or concrete piersLevelling
Timber deckJoist connectionDeck detail
Narrow accessSplit load / craneDelivery

Past 40 km a mileage line appears; city jobs are usually fixed. Moisture is read in the morning; high moisture delays timber joints. Same notes appear in FAQs.

What does the survey form record?

Width, depth, roof height, gutter direction, neighbour wall, gate width. Two people confirm. Production does not start without written confirmation. File via quote or contact. Models: products.